Getting Landscape Lighting Right on a New Construction Home
A new construction home presents the ideal opportunity to design and install landscape lighting correctly from the beginning — before the landscaping is fully established, before the driveways and walkways are finalized, and while conduit can be run under hardscape without cutting. Texas homeowners and builders who think ahead about landscape lighting can achieve dramatically better results than those who retrofit lighting after the landscaping is complete.
When to Plan Landscape Lighting in New Construction
- Pre-landscaping conduit placement — The single most valuable step in new construction landscape lighting planning is running low-voltage conduit under driveways, walkways, and patios before those surfaces are poured. Retrofitting conduit under concrete costs significantly more than running it during construction.
- Transformer location planning — Planning the transformer location during construction ensures the transformer is in a logical, accessible location near power with an appropriate mounting surface — not a last-minute installation in an awkward location.
- Coordination with landscape architect — When working with a landscape architect on new construction, coordinating the lighting plan with the landscape plan ensures the fixtures enhance the plantings rather than conflicting with them.
Phased Installation for New Construction
Most new construction landscape lighting projects benefit from a phased approach: initial infrastructure (conduit, transformer, main feed) in Phase 1 during construction, with the fixture installation in Phase 2 once the landscaping is established and the full picture of the property is visible.